Telcordia Tech testing to take off 12/7.
Last September we reported on the fact that one of the nine (oops, make that ten) white space database administrators had announced that its system was ready to have its tires kicked. That 45-day test has since wrapped up, and the Commission has since invited comments on the results.
And now a second database administrator – Telcordia Technologies, Inc. – has given the word that it, too, is ready for testing . . . or at least it will be, as of December 7. That date will kick off Telcordia’s 45-day test period, during which members of the public are invited to run the Telcordia system through its paces to ensure that it does what it’s supposed to do. (In case you’ve forgotten, all white space database systems are expected to (1) correctly identify channels in the TV band that are available for unlicensed operation, (2) register facilities in that band that are entitled to protection, and (3) afford protection to authorized services and registered facilities as specified in the Commission’s rules.)
You can access the Telcordia system at https://prism.telcordia.com/tvws/home/trial starting December 7 (but not before) and running through January 20, 2012, possibly longer if the Commission determines that an extension is warranted. The Commission encourages the public to take the system for a test drive to make sure that it’s doing what it’s supposed to do. Items available for testing include a channel availability calculator, and separate utilities to register: MVPD receive sites; broadcast auxiliary temporary receive sites; fixed TVWS devices; and wireless microphones. Obviously, if any inaccuracies pop up, they should be reported to Telcordia pronto.
Check out our previous posts for more background on the white space database administrator program.